Skip to main content
The Details
Location: Newport News, Virginia
Value: $1,100,000
Completion Date: June, 1995
Delivery Method: Design-Bid-Build
Owner: Northrop Grumman
Architects: Lockwood Greene

This project consisted of a cast in place utility trench/tunnel to the future nuclear waste facility. Asbestos/undesirable materials were uncovered during the excavation process. Despite this, all work was completed on schedule.