The Details
Location: Williamsburg, Virginia
Size: 50,482 square feet
Value: $16,731,659
Completion Date: June, 2013
Delivery Method: Design Build
Owner: NAVFAC Atlantic
Architects: Michael Baker Jr.

This project consisted of three (3) sites with five (5) structures. Construction included a total of 50,482 SF of administration offices, training classrooms, warehouse, maintenance shops, vehicle maintenance, support spaces, Mock Ship, Mock Pier, Mock Cargo Hold, and a Chemical Biological Radiological (CBR) test chamber. Work also included the site demolition of all of the existing buildings at Site A. Before demolition occurred, temporary office space renovations were implemented and completed in building CAD 296. Site A included the two-story Logistics Building and the two-story Vehicle Maintenance Building. Site B includes a one-story building base to support the relocated Mock Ship crane. Work included salvaging and reinstalling the crane. Site B also included a concrete Mock Pier and a Mock Cargo Hold, consisting of a one-story steel framed structure with multiple hatch openings and covers. Site C included the CBR test chamber, consisting of a one-story masonry building. The project was constructed as brick and concrete block units with concrete floors, and a standing seam metal roof. The buildings included HVAC, electrical equipment, pre-wired work stations, site preparation, and utilities. Exterior facilities included roadways, sidewalks, lighting, parking, fencing, facility signage, landscaping, Bio Retention System, and site improvements. The project included physical security, and force protection measures were incorporated into our design including feasible standoff distance from roads, vehicle unloading, landscaping, and bollards. This project was designed with cost effective energy conserving features and was certified LEED Platinum.