Skip to main content
The Details
Location: Norfolk, Virginia
Size: 100,000 square feet
Value: $3,718,245
Completion Date: June, 1996
Delivery Method: Design-Bid-Build
Owner: Norfolk Airport Authority
Architects: Kelco and Easter, Inc.

S.B. Ballard Construction Company was the General Contractor on the Snow Removal Equipment Maintenance Facility at the Norfolk International Airport. This project consisted of a 41,000 square foot renovation to the existing facility and sand storage building, a new pre-engineered building and 100,000 square feet of concrete paving.