Skip to main content
The Details
Location: Stuarts Draft, Virginia
Size: 1,650,000 square feet
Value: $6,148,754
Completion Date: June, 1996
Delivery Method: Design-Bid-Build
Architects: Ralph Parsons

S.B. Ballard Construction Company was the Concrete Contractor on the Target Mid-Atlantic Distribution Center. Work consisted of the foundation, concrete slabs, and tilt-up panels on this 1,650,000 square foot facility. The bulk of the floors are 8” reinforced slab on grade. Over 57,000 cubic yards of concrete was poured.

The exterior walls are tilt—up concrete, with the largest panel 42.5’ wide by 38’ tall and weighing approximately 80 tons. According to the American Tilt-Up Association, this is the 8th largest tilt-up building in the world.