The Village Student Housing Project Phase 1 is the beginning of a multi‐phase project to replace the nine exiting separate buildings in the Village Area […]
Timelapse Video (22-month duration)
This timelapse video captures construction work on the Village Student Housing Project Phase 1 beginning with the demolition of the old Ikenberry Hall (May 2023 – September 2023), followed by site work in preparation for construction of the new residence hall (September 2023 – November 2023), followed by vertical construction of the new 5-story residence hall (November 2023 – January 2025). As of February 2025, most of the building’s exterior work is now complete and the project team is focused on the build-out of the interior spaces. Work is proceeding on-schedule and the new residence hall is expected to be completed this Summer and ready to receive new students for the Fall 2025 Semester.



2828 Shipps Corner Rd.
Virginia Beach, VA 23453
P (757) 440-5555 F (757) 451-2873
104 Shockoe Slip Lower Level, Suite C
Richmond, VA 23219
P (804) 343-3433 F (804) 343-3412
250 E. Elizabeth St. Suite 117
Harrisonburg, VA 22802
P (757) 689-6817
Assets | Privacy Policy | Terms & Conditions
© 2026, S.B. Ballard Construction Company, All Rights Reserved