This project consisted of a cast in place utility trench/tunnel to the future nuclear waste facility. Asbestos/undesirable materials were uncovered during the excavation process. Despite […]
This project consisted of a cast in place utility trench/tunnel to the future nuclear waste facility. Asbestos/undesirable materials were uncovered during the excavation process. Despite this, all work was completed on schedule.
2828 Shipps Corner Rd.
Virginia Beach, VA 23453
P (757) 440-5555
F (757) 451-2873
104 Shockoe Slip
Lower Level, Suite C
Richmond, VA 23219
P (804) 343-3433
F (804) 343-3412
250 E. Elizabeth St.
Suite 117
Harrisonburg, VA 22802
P (757) 689-6817
Assets | Privacy Policy | Terms & Conditions
© 2023, S.B. Ballard Construction Company, All Rights Reserved