This project consisted of the construction of approximately 600 feet of a new radiological support facility utility trench near Pier 4 at Newport News Shipyard. […]
This project consisted of the construction of approximately 600 feet of a new radiological support facility utility trench near Pier 4 at Newport News Shipyard. The utility trench is 14’ wide and 9’ high. The bottom is cast in place concrete as a foundation. This includes concrete ledges for steam pipe and construction gas pipe supports. The walls are cast in place concrete with varying height from 5’ to 9’. The top sections are 114 precast concrete removal tops with reusable lifting eyes and galvanized metal edging. They are 10’ long and 5’ wide.
The project included relocation and installation of a new railroad spur of approximately 200’. This project included a sewage lift station with forced main piping, site work including removal and handling of contaminated soil, a new asphalt road way and piping for fire protection hydrants and storm drainage.
2828 Shipps Corner Rd.
Virginia Beach, VA 23453
P (757) 440-5555
F (757) 451-2873
104 Shockoe Slip
Lower Level, Suite C
Richmond, VA 23219
P (804) 343-3433
F (804) 343-3412
250 E. Elizabeth St.
Suite 117
Harrisonburg, VA 22802
P (757) 689-6817
Assets | Privacy Policy | Terms & Conditions
© 2023, S.B. Ballard Construction Company, All Rights Reserved