This project consisted of the removal and replacement of 6,500 cubic yards of 650 flex reinforced concrete pavement using corrosion inhibitor enhanced concrete. This was […]
This project consisted of the removal and replacement of 6,500 cubic yards of 650 flex reinforced concrete pavement using corrosion inhibitor enhanced concrete. This was a 135,000 square foot multi-phased project completed within a 120 day timeframe required by the Owner. Concrete was placed at night to avoid impacting the Owner’s activities.